Chute Wash Recovery

add to quote list locate a dealer

Overview

Chute Wash Recovery System helps ready mix producers meet current EPA regulations and state regulations by managing jobsite concrete wash water, utilizing an approved “user friendly” green solution.

This system was developed by experienced ready mix professionals to be the most simple and cost effective solution for any site situation. The patent pending Chute Wash Recovery System has been field tested and proven to be effective. “Our customers can now see our environmental position in action and the system will pay for itself within 5 months” says Scott French, Owner of Las Animas Concrete, Santa Cruz, California.

Time is money in the concrete business and Innovative Concrete Solutions has refined this system based on creative design and user feedback to become the easiest to use and quickest system in the market today.

Quick to install, quick to use, with no hoses to lose or pumps to plug.

Advantages

  • Cost effective “green” solution
  • No Pumps, Valves, Hoses, or Buckets
  • Built with plate steel for durability (virtually maintenance free)
  • Easy to use and install
  • Saves significant time on wash down compared to others using less water, taking less steps, and less handling
  • Retains all wash water in a separate containment vessel, making disposal easy
  • 25 gallon capacity
  • Operates in freezing climates with no extra steps
  • 500% ROI in the first year with an optimum business plan

Which in turn:

  • Reduces costs – TIME IS MONEY. An average driver spends 30-45 minutes of rinse time following a color delivery. Using GrayAgain color loads will require significantly less time and effort.
  • Reduces Environmental Footprint – An estimated 300 gallons of water is used per load for integral color washout.* With GrayAgain that number can be reduced by over 280 gallons of water per load.
    * Source –National Stormwater Summit antly less time and effort.
  • chute-wash-lrg